Client Extension - reversal

Date: Tue, 24 Aug 1999 15:41:57 -0700 (PDT)
From: Mohan muthan mmuthan@yahoo.com
Subject: Project Gurus - Problem with Client Extension

Hi,
I have a Client Extension that is written to Calculate the Overtime Costs for the Employees. It.s 1.5 times the hourly rate.So the Client Extension creates an another transaction for .5 and calculates the Amount. Incase if an Employee has worked for 40hrs Overtime then there will be one row with 40hrs and another row with 20hrs. But the hours doesnot display instead the Amount is calculated correctly. The split is working fine.The above thing is done in One Expenditure Batch(Original Batch).

I am now trying to reverse that due to some data incorrectness. So I create another batch(Adjust Batch) and try to reverse the original. I enter the New Batch name and press reverse original and pick up the employee name,project number and task and Exp Date. I press Reverse1.

The Problem is for 40 hrs of overtime I get -40hrs. But for the .5 times(20 hrs) I get a row in the Orignial Batch and not in the Adjust batch.

Can anyone help me telling how it is done..
Thanks


Labor Trnsaction Extension - overtime calculation

Date: Thu, 26 Aug 1999 09:03:53 GMT
From: "Sunny Sunny" sunn999@hotmail.com
Subject: Labor Transaction Extension in Projects

Hi,
I need help on developing a Labor Transaction Extension in Projects.I want to use this extension to calculate the overtime for a particular project Expenditure.

I am getting an error when I run the Distribute Labor costs program from Projects-The Log explains that error occured in the Add_transactions package which is in the Labor Transaction Extension.

Any help will be appreciated.
Sunil Wahi.


Date: Thu, 26 Aug 1999 10:25:23 -0400
From: "Klosterman, Lisa H." KlosLH@jea.com
Subject: RE: Labor Transaction Extension in Projects

Hi Sunil,
The Labor Transaction Extension returns a status code in one of the parameters. I'm not sure, but I think if you run the Distribute Labor Costs in debug mode, you might get some additional information in the request log that will help you.

-- Liza Klosterman
PORT Consulting, Inc.


Date: Thu, 26 Aug 1999 07:43:44 -0700
From: "Haseeb, Mohamed" Mohamed.Haseeb@Jacobs.com
Subject: RE: Labor Transaction Extension in Projects

Sunil,

Only possibility I could think of is --- you must be missing some parameter / giving an incorrect parameter while calling add_transactions_package. Make sure you are using the exact number of parameters, the column type is okay and the value you are passing are valid.

To verify that, try to run the package directly from SQL and see whether it inserts transactions into the expenditure items table.

Regards.. Haseeb


Date: Thu, 26 Aug 1999 10:29:03 -0700
From: Donna Armstrong donnabsc@gte.net
Subject: RE: PA Labor Transaction Extension in Projects

Hi Sunil,

Have you checked the log file for more detailed error messages? One thing that people sometimes forget is that it is a LABOR only extension. Meaning that the expenditure_type you're using for the overtime transaction you're creating must be STRAIGHT_TIME or OVERTIME, not USAGES, EXPENSE_REPORT, or MISCELANEOUS system linkage function or classification I think they call it now.

Hope this helps,
Donna
Donna M. Armstrong
Business Systems Consultant
Office: 310.457.4200
VM/Pager: 800.303.2527
E-Mail: donnabsc@gte.net


Date: Fri, 27 Aug 1999 16:54:45 GMT
From: "Sunny Sunny" sunn999@hotmail.com
Subject: RE: Labor Transaction Extension in Projects

Hi Liza,
Thanks for the mail, I shall try that out ,
The Expenditure type I am using is Straight time.
Error code shows me -1400.Is there any addition to be made to the code d template which has been provided. I have removed all the REM 's and compiled the package.

If I have to write code can u tell me what do I add there. According to the procedure it is trying to pick up those expenditure types with 'ST' as the Exp. type .The parameters are perfect.
What do I do next.

The Related transaction procedure next has to add new exp type with say 'Double time Premium' as the exp type.
I could not make out whether this is being handled by the procedure or not. Thanks for the reply, shall await any other help.

Regards, Sunil Wahi



Project Costing - Refresh Summary Amounts Error

Date: Thu, 26 Aug 1999 09:28:47 -0400
From: frair_patti@adtranzna.com
Subject: Project Costing - HELP - Refresh Summary Amounts Error

We are receiving an error in production with PAXACRPT: PRC: Refresh Project Summary Amounts:

Last few lines of log file with debug on:

MSG-00001: Refreshing Actual transaction accum
MSG-00001: Records Updated = 3740
MSG-00001: Deleteing Actual transaction accum details
MSG-00001: Records Deleted = 7056
MSG-00001: Refreshing transaction accum
MSG-00001: Refreshing Revenue transaction accum
MSG-00001: Records Updated = 10
MSG-00001: Deleteing Revenue transaction accum details
MSG-00001: Records Deleted = 13
MSG-00001: Accumulating CDLs
MSG-00001: Exception Generated By Oracle Error: ORA-01422: exact fetch
returns more than requested number of rows
MSG-00001: Skipping the accumulation for project ATOE
REP-1419: 'afterreport': PL/SQL program aborted.

We have been running this process for 6 months with no problem. We have not installed any patches at all and our current environment is 10.7 SC 16.1 patchset E. This process runs monthly to appropriate initilize the summary amounts.

Any help in this area is appreciated.
Thank you,
Patti Frair
frair_patti@adtranzna.com
DaimlerChrysler Rail Systems
Adtranz
(412) 655-5264


Date: Thu, 26 Aug 1999 10:32:14 -0400
From: "Klosterman, Lisa H." KlosLH@jea.com
Subject: RE: Project Costing - HELP - Refresh Summary Amounts Error

Hi Patti,
Hmm, I'm not sure why your would get this error now since it doesn't sound like your environment has changed. Have you tried calling Oracle Support?

Also, I'm not sure why you are running this every month. It is my understanding (according to Oracle Support) that you only have to run the Refresh Project Summary process once after you have loaded converted data, and you have to run it once if you install Patchset F (I believe). You can run the Update Project Summary process to update the summary amounts.

-- Liza Klosterman
PORT Consulting, INC


Date: Thu, 26 Aug 1999 10:43:05 -0400
From: "Innamuri, Chakrapani" cinnamuri@btg.com
Subject: RE: Project Costing - HELP - Refresh Summary Amounts Error

Patti,

To make the things more simple, I would suggest opening the RDF file and check the "After report" trigger. (or) Run the report with TRACE on and check the TRACE file.

There is some cursor which should return only ONE RWO but the cursor is fetching more than ONE record now.

Please check for duplicate records somewhere.

You can get the report from Oracle Developer's KIT or check under $AU_TOP for the RDF file.

I solved souple of such problems earlier by opening the form in Reports designer (or) by running TRACE.

-chakrapani


Date: Thu, 26 Aug 1999 11:52:56 -0400
From: frair_patti@adtranzna.com
Subject: RE: Project Costing - HELP - Refresh Summary Amounts Error

Hi Liza,
I have a TAR for this problem at a priority 1 now. If you do not run the Refresh Summary Amounts and only execute the Update Project Summary Amounts the PTD (period-to-date) amount is not set to zero for those Projects that have no activity for the month which distorts current month reporting.

I appreciate your reply, Thanks!
Thank you,
frair_patti@adtranzna.com
(412) 655-5264


Date: Thu, 26 Aug 1999 16:10:44 -0700
From: Eric Tegenfeldt eric_tegenfeldt@rand.org
Subject: RE: Project Costing - HELP - Refresh Summary....

Hi Patti,

Sorry to hear about the problem. Not sure if this will be helpful or not but I have two comments, one regarding the problem you reported in your original e-mail and the other regarding your explanation of the purpose of the Refresh Summary below.

1. As another individual suggested (sorry, I don't remember the name or I would give full credit), I would approach this as a potential data error or as the uncovering of a bug based on a new data condition and research the logic behind the process accordingly. I looked at the report code (PAXACRPT.rdf) and saw that a package is being called in the BEFOREREPORT trigger. The name of the package is PA_PROJ_ACCUM_MAIN. The good news is that the code is accessible (unlike Generate Revenue, etc.) if you have SELECT privileges on the DBA_SOURCE table. The bad news is that the package is over 2400 lines long.

However, I did a select looking for just the word "INTO" (since you are getting a "Too Many Rows"-type error) and there are not very many occurences of that word. If you spool the text out to a file, you could probably track down the places in the code pretty quickly and see if one of those statements is returning more than one row for your "ATOE" project. Of course, it is possible that the error is being generated by a called function or procedure outside of this package, in which case you will have to do some more digging.

2. I had not heard before that the Refresh process was required to reset the PTD values. In fact, here at Rand, the Refresh process has never been run since they first cut over to 10.7 a year ago. I went and checked a number of projects and the only ones that have PTD values are the projects that had activity in the current "Reporting" period. Granted, they are now on patchset H so perhaps it is something that was just changed between patchset E and patchset H but you might want to double-check and see if you can get by just running the Update Summary process.

Hope this helps,
Eric Eric B. Tegenfeldt Office: 310.393.0411 X7164
Oracle Projects Consultant Pager: 661.538.3896
Business Information Systems
RAND Corporation



Employees - link to a project

Date: Fri, 27 Aug 1999 02:01:51 PDT
From: "simon daniel" ora_apps@hotmail.com
Subject: Employees in PA (project accounting)

Hi ,

How do i link an employee to a project in project accounting if i dont have employee as one of my flex field structure.

2) Where do i enter the start organisation value that is required while setting up project accounting.

3) I have project accoutning installed, both billing and costing. when i attach the costing responsibility to a user, it does'nt show in the responsibility list for that user. I can only use billing super user.

Appreciate your inputs .
Thanks DS


Date: Fri, 27 Aug 1999 09:10:56 EDT
From: DIGIACKG@aol.com
Subject: Re: Employees in PA (project accounting)

Daniel -

#1) What do you mean 'link an employee' to a project? Do you mean as a Project Manager (or other 'Key Player')? Or to be able to enter their timesheet to the project? Either way, they must be in the HR tables (PER_PEOPLE_F, etc).

#2) Your start organization value is entered in your implementation options screen. There are Organization Hierarchy screens to set up an organization hierarchy structure.

#3) When version are you using. I have not used Release 11, but with 10.7, most responsibilities are pre-packed as either Character or GUI -- you must make sure you select correct one.

Hope these answers help. Let me know if I can be of further assistance.

Kevin.


PRC Distribution Expense Report errors

Date: Wed, 01 Sep 1999 08:39:16 PDT
From: "prince suthakar" prince_sutha@hotmail.com
To: oraapps-l@cpa.qc.ca
Subject: help for PA (please help it very urgent)

Pa guru,

My user ran the PRC distribution expence report.

The report showing the status is : Incomplete Auto Accounting Rules.
Any one Face this type of problem, Please help it .
What is the problem? please guide me.
Tia
Prince


Date: Wed, 01 Sep 1999 16:03:06 GMT
From: "Jaayanti Vishwanathan" vijaay@hotmail.com
To: oraapps-l@cpa.qc.ca
Subject: Re: help for PA (please help it very urgent)

The best way to trouble shoot this problem is :

1. Put Debug Mode ON in profile for user
2. Then check Request log. It says what is wrong in your Auto Accounting rule , i.e., it should say PA_AA_NO_LOOKUP or PA_AA_TOO_MANY_ROWS , etc.

Good luck .


Date: Wed, 01 Sep 1999 09:37:06 PDT
From: "prince suthakar" prince_sutha@hotmail.com
To: oraapps-l@cpa.qc.ca
Subject: Re: help for PA (please help it very urgent)

I am asking very simple question don't mind it. how do i put debug mode on in profile for user.


Date: Wed, 01 Sep 1999 19:01:47 GMT
From: "Jaayanti Vishwanathan" vijaay@hotmail.com
To: oraapps-l@cpa.qc.ca
Subject: Re: help for PA (please help it very urgent)

Hi All,

If you login as System Admin and click user profile option and then retrive for that particular user and you should see 'PA:Debug Mode'. Make that Yes and you should able to get detail request log for that user once he runs any process.

Let me know if you have any question.


Date: Wed, 01 Sep 1999 13:01:08 PDT
From: "prince suthakar" prince_sutha@hotmail.com
To: oraapps-l@cpa.qc.ca
Subject: Re: help for PA (please help it very urgent)

Hi all,

I put debug mode on to user, and run that expense report i got detail log file. but i don't have too may rows or pa_aa_no_lookup.

To day only i got this problem. could please help it .

Thanks


Date: Wed, 01 Sep 1999 13:52:01 -0700
From: Donna Armstrong donnabsc@gte.net
To: OraApps-L@cpa.qc.ca, prince_sutha@hotmail.com
Subject: Re: help for PA (AutoAccounting)

Hi Prince,

Have you looked at the AutoAccounting Setup for Expense Reports? Navigate - Setup - AutoAccounting - Assign

Query up the record for the Distribute Expense Reports (Debit) function (I forget the title as it changed between releases). Then you can see the rules that are being executed for the record that got this error. I seem to recall this message when no value is found in a lookup set, but it could be a number of things.

Hope this info helps,

Donna
Donna M. Armstrong
Business Systems Consultant
Office: 310.457.4200
VM/Pager: 800.303.2527
E-Mail: donnabsc@gte.net


Date: Wed, 01 Sep 1999 14:03:48 PDT
From: "prince suthakar" prince_sutha@hotmail.com
To: oraapps-l@cpa.qc.ca
Subject: Re: help for PA (AutoAccounting)

Hello all,

When i put debug mode on profile , i got detial log. I log file have

- batching totals (by expense report)
1 processed
0 expense eports batched
1 errors

how to find this error
thanks


Date: Thu, 02 Sep 1999 06:19:39 PDT
From: "prince suthakar" prince_sutha@hotmail.com
To: oraapps-l@cpa.qc.ca
Subject: Re: help for PA (please help it very urgent)

Hi all,

Thank you very much for all, I solved problem. User made a wrong entry.

Thanks
prince



Enabled Flag in pa_projects_all

Date: Wed, 01 Sep 1999 12:06:53 -0500
From: "Danette Fedock"danette_fedock@ccmail.c-tec.com
To: oraapps-l@cpa.qc.ca
Subject: Projects: Enabled flag

How does the enabled flag in pa_projects_all become anything other than 'Y'? We thought it would change when you have a close date that is prior to the current date.



Journals from AP/PO - adjusting incorrect codes

Date: Thu, 2 Sep 1999 10:00:09 +0800
From: "Stankevicius, Jon" Jon.Stankevicius@health.wa.gov.au
To: "'OraApps-L@cpa.qc.ca'" OraApps-L@cpa.qc.ca
Subject: Project Accounting Journals - HDWA

We are running running Oracle Projects Ver 4.1 and Oracle Applications Ver 10.7SC as a basic costing system.

Normal entry to the Projects Module is via Payables Invoices. We do not currently use 'Expense Reports' as, I understand, these cannot code to the same Expenditure Types because in Oracle Projects, Expenditure Types are quarantined to a single document source (eg., Payables Invoices).

Apart for from the Oracle Projects Module itself, the only other Modules where a project code can be input are Purchasing and Payables.

So the question arises: How do you correct something that has been mis-coded? OK you say, got to the Projects Module and transfer the expenditure from one project to another etc. Cost split at will. Fine, but note that the report audit trail for 'internal' transfers of expenditure is problematic, in that the two standard reports available to do this can only be run one project at a time (why not a range!!).

However, the above procedure does not cater for the instance where the incorrect amount was coded to the Projects Module from a Payables Invoice. No amount of internal transfers can transfer this expenditure out, or otherwise advise adjust the distributions (both Project and JL) made on the original Payables Invoice. You suggest: Adjust the original invoice? I'm not sure we can do this once the invoice is paid. We have 'funds checking' enabled through to Purchase Requisition but have not 'switched it on' at present.

So I believe that Oracle Projects needs a journal facility. I don't know why the General Ledger Module does not provide us with such a window. After all, other adjustment journals (to source documents) are done via GL journals. So why not the ability to manipulate expenditures (both among, as well as, to and from) for Projects?!!

Our present workaround is to use a 'special vendor' and use a Payables invoice as our 'journal'. Like any journal, the it must total zero dollars. Such a method gives us the ability to adjust expenditures between projects as well as into and out of the Projects Module, ie., we can mix both Project and GL codes on the one invoice. There are problems with this method I am happy to discuss, if anyone is interested.

I was just after some feedback from any other Oracle Projects Users on how they tackled this issue, or whether our own understanding of the Module is at fault.

JonS
Jon STANKEVICIUS


Date: Thu, 2 Sep 1999 13:46:06 +0930
From: "Hayes , Kathleen" Kathleen.Hayes@boral.com.au
To: "'oraapps-l@cpa.qc.ca'" oraapps-l@cpa.qc.ca
Subject: RE: Project Accounting Journals - HDWA

I believe the journal facility is available in a future version. However, if you currently enter incorrect amounts for an invoice then it has to be corrected within AP. Transfers within Projects is only for amounts going from one project to another or for tasks. Your workaround is a good idea - thanks for the suggestion.
Regards,

Kathleen Hayes
Oracle Applications
BORAL LTD Shared Operations Centre (SOC)
Level 7, 2-10 Wentworth Street
PARRAMATTA NSW 2150
Telephone 02 98486052
Fax 02 98486099
Mobile 0408223059
Email Kathleen.Hayes@boral.com.au


Date: Thu, 2 Sep 1999 08:06:35 -0400
From: Zoe Reyes zreyes@goaa.org
To: "'oraapps-l@cpa.qc.ca'" oraapps-l@cpa.qc.ca
Subject: RE: Project Accounting Journals - HDWA

I like the idea of being able to adjust the payment voucher better to ensure that any future reclassifications of expenditures that have been processed through Oracles Payables are documented in the Payables module.

However, those of us who work in an Oracle fund accounting setting have found out that Oracle does not allow one to make any reclassifications against a payment voucher that has been paid, even if the adjustment nets out to zero, which would be the only type of adjustment one should do to a paid voucher anyway. The only way we have been able to make reclassifications against a paid voucher is through a cumbersome, error-prompt Payables debit/credit memo process. (By the way, has anyone found a better way of doing these kinds of adjustments?)

However, your point is well taken. There has to be a better way to reclassify/correct Projects costs.


Date: Thu, 2 Sep 1999 13:27:22 -0500
From: Oracle - Kathy Farmer oracleadmin@co.scott.mn.us
To: "'oraapps-l@cpa.qc.ca'" oraapps-l@cpa.qc.ca
Subject: RE: Project Accounting Journals - HDWA

We have also faced the same issue with needing to correct invoices in Payables. Because we have balancing offset turned on we cannot make changes to posted invoices, which is the solution Oracle suggests. Our workaround is as follows:

Temporarily turn off the balancing offset option and turn on "make changes to paid invoices" in the Payables options. While this is turned off no one should approve any invoices because it will cause incorrect fund accounting entries out of AP. You can then go into the invoice lines, reverse the incorrect line and enter the correct coding on a new line. This generates an in and out entry in the payables transfer to GL - just make sure both the reversed line and the new line have the same GL date. Now (and this is key) turn the "make changes to paid invoices" off and turn the balancing offset back on. It is absolutely critical that this is changed back BEFORE the invoice(s) are approved as it is the approval function that populates the ap_code_combination_id for the line with the correct balancing segment.

The first time we did this after discussing with support they instructed us to make sure it was turned back on before we ran the next Payables Transfer to GL. WRONG. This created a problem for us where our AP Trial Balance by Fund segment did not balance to each fund in the GL, although it was correct in total.

The downside of this approach is that it really requires corrections to be done at a time when no other user could be approving invoices. As all our invoice approval in done in one location, we have good control over that. The up side is that is does maintain an audit trail on the original invoice.

I do like your Special Payable "journal" idea; I think we could use it for some non-Payables adjustments that we'd like to do. We've been trying to use the expenditure entry to do this, but as you noted, it's not ideal because of the expenditure types not being the same. What problems have you encountered in using this as a "project journal"?

I understand there is a project journal in Rel. 11 but I don't know that the issue of having different expenditure types for each source has changed.

Kathy Farmer
Scott County


Date: Fri, 03 Sep 1999 00:43:50 +0300
From: "Dina Rotem (h)" dinar@rafael.co.il
To: Ora OraApps-L@cpa.qc.ca
Subject: RE: Project Accounting Journals

Kathy

In release 11 we do have the ability to enter journals to Projects using the "miscellaneous" transactions.

In addition, release 11 enables you to have more than one expenditure type class per expenditure type. Meaning, cost could be entered to the same expenditure type through different sources.

Dina


Date: Fri, 3 Sep 1999 10:57:06 -0400
From: frair_patti@adtranzna.com
To: oraapps-l@cpa.qc.ca
Subject: Re: Project Accounting Journals - HDWA

We have written a Developer 2000 program "Project Journal Entry" to accomodate adjustments that are not feasible from other sources and as a data entry process for Project and Ledger entries such as Project reserves, IAS loss, cost of sales etc. transactions. Basically this process writes/maintains transaction in the PA open interface table pa_transaction_interface_all. The other purpose of the Project Journal Entry program is to permit the users to correct entries in the interface table without getting IT involved. We have set up various transaction sources and corresponding autoaccounting rules to enable this process. We found the Expenditure Batch entry program to limited in not having the ability to specify a transaction source and since we are in production under 10.7 SC our expectation is in release 11 we can throw away our custom form. If you are interested in this program just e-mail me directly.

Thanks,
Patti Frair
frair_patti@adtranzna.com
DaimlerChrysler Rail Systems
Adtranz